Project Dashboard
Active Projects
2
1 active · 1 planning
Workers On Site
47
↑ 3 from yesterday
Budget Utilised
27%
₹1.2Cr of ₹4.5Cr
Open NCRs
1
1 minor · 0 major
Project Progress
Demo Residential Tower27%
G+7 RCC · ₹4.5Cr · Structural phase
Demo Commercial Complex0%
G+3 Steel · ₹2.8Cr · Planning stage
Monthly Expense Trend (₹ Lakhs)
Task Status
3
Done
4
In Progress
5
Todo
1
Urgent
🔴 Safety audit — ScaffoldingUrgent
🟡 Structural drawings — Found.Active
🟢 TMT bars procurementDone
Safety This Month
4
Toolbox Talks
1
Near Miss
0
LTI
PPE Compliance92%
Quality Summary
Cube Tests3 Pass · 0 Fail
QC Inspections3 Pass · 1 Fail
NCRs Open1 Minor
Next InspectionIn 2 days
Projects
Demo Residential Tower
DEMO-PRJ-001
G+7 RCC framed residential tower. IS 456 / IS 13920 seismic design. Mumbai.
Budget
₹4.5 Cr
Spent
₹1.2 Cr
Start
Mar 2026
Deadline
Jun 2027
Overall Progress27%
Demo Commercial Complex
DEMO-PRJ-002
G+3 steel-framed commercial complex. IS 800:2007 design. Starting in 30 days.
Budget
₹2.8 Cr
Spent
₹0
Start
Jul 2026
Deadline
Dec 2027
Overall Progress0%
Structural Design Engine
IS 456 RCC Design
✅ Beam design (IS 456 Cl. 22-26)
✅ Column design (IS 456 Cl. 39)
✅ Slab design (IS 456 Cl. 24)
✅ Foundation design (IS 1904)
✅ Seismic detailing (IS 13920)
IS 800 Steel Design
✅ Beam design (IS 800 Cl. 8)
✅ Column design (IS 800 Cl. 7)
✅ Connection design
✅ AISC 360-22 check
✅ Eurocode 3 check
Mix Design & BBS
✅ IS 10262 mix design
✅ BBS generation (IS 2502)
✅ Bar bending schedule PDF
✅ Quantity takeoff
✅ BOQ integration
Sample Calculation — RCC Beam (IS 456:2000)
// Beam B1 — Span 6.0m | M25 | Fe415 | 230×450mm
Factored Bending Moment : Mu = 1.5 × 112 = 168 kN·m
Effective Depth : d = 450 - 40 - 10 = 400 mm
Limiting Moment capacity : Mulim = 0.138 × fck × b × d² = 0.138×25×230×400² = 126.96 kN·m
→ Doubly reinforced beam required (Mu > Mulim)
Tension steel (Ast) : 4–20mm dia (Ast provided = 1257 mm²) ✓
Compression steel (Asc) : 2–16mm dia (Asc provided = 402 mm²) ✓
Shear reinforcement : 8mm @ 150mm c/c (IS 456 Cl. 40.4) ✓
// Result: SAFE — All checks passed per IS 456:2000
BIM 3D Model Viewer
Ground Floor
First Floor
Second Floor
Third Floor
Floors 4–7 (Typical)
8 Floors
25.6m Height
4,800 m²
Slab
Column
Beam
Selected Element
Ground Floor
Type: Slab
Material: Concrete M30
Thickness: 150mm
Area: 12.0 × 8.0 = 96 m²
Volume: 14.4 m³
Design Code: IS 456:2000
Status: Complete
Elements Summary
Columns32
Beams64
Slabs8
Walls48
Doors/Windows112
Model Info
Name: DEMO-BIM-001
Version: 1.2
Format: JSON / IFC
Gross Area: 4,800 m²
Height: 25.6 m
Clash Detection
✅ Structural vs Arch — 0 clashes
✅ Structural vs MEP — 0 clashes
⚠️ Arch vs MEP — 2 soft clashes
IFC Export
✅ IFC 2x3 compatible
✅ Revit import ready
✅ Navisworks import ready
Scheduling — CPM / EVM
PV (Planned Value)
₹120L
Week 12
EV (Earned Value)
₹112L
SPI = 0.93
AC (Actual Cost)
₹118L
CPI = 0.95
EAC (Forecast)
₹473L
BAC = ₹450L
Gantt / Activity Schedule
| Activity | Duration | Start | Finish | Float | Status | Progress |
|---|
Site Diary
Today's Site Diary —
Sunny morning / Cloudy afternoon
34°C
68% humidity
Workers on Site
47
Engineers
6
Work Done: Foundation concreting — Column C1-C6 completed. Cube samples taken. Formwork stripped at Basement.
Materials Used: Cement 20 bags · TMT 12mm 400kg · Aggregate 3 cum
Equipment: Tower Crane: 1 · Vibrator: 2 · Concrete Mixer: 1
Instructions: Maintain curing for 14 days post-pour. No loading on new slab for 7 days.
Last 5 Days
1
Today
Foundation concreting C1-C6
2
Yesterday
Rebar fixing — GF columns
3
2 days ago
Formwork striking — Basement
4
3 days ago
RCC column pour — Grid A
5
4 days ago
Brickwork — External walls
Equipment & Plant
Workers & Attendance
Total Workers
47
On project
Present Today
44
93.6% attendance
Overtime Today
8
workers
Absent
3
Prior approval
Quality Control
Cube Test Results
| Sample | Element | Grade | fck MPa | Result |
|---|---|---|---|---|
| CUBE-001 | Column C1-GF | M30 | 31.2 | Pass |
| CUBE-002 | Slab S1-GF | M25 | 26.5 | Pass |
| CUBE-003 | Beam B1-GF | M30 | 29.8 | Pass |
QC Inspections
| No. | Type | Element | Result |
|---|---|---|---|
| QCI-001 | Rebar | Columns GF | Pass |
| QCI-002 | Formwork | Slab 1F | Pass |
| QCI-003 | Pre-pour | Slab 1F | Pass |
| QCI-004 | Brickwork | Ext Wall | Fail |
NCR — Non-Conformances
NCR-001
Brick masonry — incorrect bond
External Wall, Ground Floor · Raised: QC Engineer
Action: Demolish and rebuild with English bond
Open · Due in 5 days
QC Checklist — QCI-001 (Rebar Inspection, Columns GF)
| # | Check Point | Reference | Requirement | Actual | Status |
|---|---|---|---|---|---|
| 1 | Bar dia and spacing correct | IS 456 Fig 5 | As per drawing | Verified | Pass |
| 2 | Cover blocks in place | IS 456 Cl.26 | Min 40mm clear | 40–45mm | Pass |
| 3 | Laps and splices adequate | IS 456 Cl.26 | Ld = 47d | 50d provided | Pass |
| 4 | Formwork joints sealed | IS 456 | No gaps | Sealed | Pass |
HSE Safety
LTI-Free Days
127
0 Lost Time Injuries
Toolbox Talks
4
This month
Open Permits
2
Height work + excavation
Risk Assessments
5
All reviewed
Recent Toolbox Talks
Working at Height — Fall Prevention
40 attendees · 20 min · Safety Officer
Concrete Pouring Safety
45 attendees · 20 min · Safety Officer
Crane Safety & Exclusion Zones
38 attendees · 20 min · Safety Officer
Risk Assessment Register
| Activity | Hazard | Score | Level |
|---|---|---|---|
| Height Work | Fall from height | 20 | High |
| Concrete Pour | Formwork failure | 15 | High |
| Crane Ops | Load drop | 10 | Medium |
| Excavation | Cave-in | 8 | Medium |
| Electrical | Electrocution | 8 | Medium |
Permits to Work
| Permit No. | Type | Title | Location | Status |
|---|---|---|---|---|
| PTW-001 | Height Work | Working at Height — Column L3 | Columns A1-A6, Level 3 | Approved |
| PTW-002 | Hot Work | Welding — Column base plates | Basement, Grid C | Closed |
| PTW-003 | Excavation | External utility trench | North boundary | Pending |
Commercial & BOQ
Contract Value
₹4.5Cr
Billed to Date
₹1.2Cr
Received
₹0.9Cr
Outstanding
₹0.3Cr
Bill of Quantities — Civil Works (Extract)
| Item | Description | Unit | Qty | Rate (₹) | Amount (₹) |
|---|---|---|---|---|---|
| 1.1 | Earthwork in excavation for foundation | cum | 420 | 280 | 1,17,600 |
| 1.2 | PCC M10 — 75mm thick blinding | cum | 28 | 4,800 | 1,34,400 |
| 1.3 | RCC M30 — Raft foundation | cum | 185 | 8,200 | 15,17,000 |
| 1.4 | Tor Steel Fe415 in foundations | MT | 28 | 68,000 | 19,04,000 |
| 2.1 | RCC M30 — Columns GF | cum | 22 | 9,500 | 2,09,000 |
| 2.2 | RCC M25 — Slabs GF | cum | 58 | 8,800 | 5,10,400 |
| Sub-Total (Civil) | 44,92,400 | ||||
Invoices
Documents
Reports & Analytics
Project Progress Report
Gantt, milestones, EVM, S-curve
PDF Export
Monthly HSE Report
Incidents, toolbox talks, PTWs, KPIs
PDF Export
Quality Control Report
Cube tests, inspections, NCR log
PDF Export
Financial Report
Budget vs actual, cash flow, BOQ
PDF Export
Labour Productivity Report
Attendance, overtime, manday analysis
PDF Export
Structural Calculation Report
IS 456 / IS 800 design calculation PDFs
PDF Export